Monday, December 15, 2025
54.0°F

All results /

August 29, 2012 1 p.m.

City of Moses Lake

Exterra LLC submitted an application for a Site Plan Review on August 23, 2012.

June 3, 2014 1 p.m.

City of Moses Lake

Notice of Application and Public Hearing

April 28, 2014 1 p.m.

City of Moses Lake

Notice of Application and Public Hearing

November 21, 2013 noon

City of Moses Lake

RAI LLC submitted an application for a Site Plan Review on November 4, 2013.

May 3, 2013 1 p.m.

City of Moses Lake

Notice of Application and Public Hearing

January 31, 2020 midnight

Legals for January, 31 2020

June 6, 2014 11:08 a.m.

Memorial Day a good time to consider cemetery needs

GUEST EDITORIAL

Memorial Day weekend saw a steady flow of visitors to Royal Memorial Gardens Cemetery. United States flags had been placed on the graves of all the known military veterans, adding to the ambiance of the cemetery.

February 4, 2014 noon

City of Moses Lake

Notice of Application and Public Hearing

December 15, 2023 midnight

Legals for December, 15 2023

December 21, 2005 8 p.m.

Soap Lake spa funding examined

Proposed $3 million project must be public-private venture

April 19, 2018 1:30 a.m.

Legals April 19, 2018

Notice of Application & Proposed Mitigated Determination of Non-Significance Date of Notice: April 19, 2018 Notice is hereby given that a JARPA (Substantial Shoreline Development Permit/ Floodplain Development Permit Application) and SEPA Checklist received by Grant County on March 26, 2018 from Roy "Jake" Long Jr. (Designated Contact: John Hermann, CBMI, 3740 Thayer Rd. NE, Moses Lake, WA 98837, 509-989-4318) was found to be technically complete on April 12, 2018. Grant County expects to issue a Mitigated Determination of Non-Significance for this proposal and the Optional DNS Process in WAC 197-11-355 is being used. This proposal may include mitigation measures under applicable codes, and the project review process may incorporate or require mitigation measures regardless of whether an EIS is prepared. This may be the only opportunity to comment on the environmental impacts of the proposal and the proposed mitigation measures. A copy of the subsequent threshold determination may be obtained upon request. PROPOSED MITIGATION MEASURES: 1. Limit the size of the project to the minimum amount necessary. 2. Project requires mitigation at a rate of 1:1 for all new over-water structures to ensure a no net loss of shoreline ecological function (approximately 314 sq. ft. of plantings). 3. Construction shall be done during the annual draw-down (when the water level is low enough to allow work with minimal disturbance of lands below the Ordinary High Water Mark). 4. Best management practices for control of erosion and sedimentation shall be implemented for the project. PROJECT: The project is proposing to install an 8-ft. by 24-ft. (192 sq. ft.) dock with approximately 9-ft. by 10-ft. boat lift and 4-ft. by 8-ft. walkway over water to the dock. ADDITIONAL PERMITS REQUIRED: WDFW HPA. STUDIES REQUIRED: Archaeological Resources Survey Report, Wetland Delineation. LOCATION: The project is located at 5912 Panorama Dr. NE on Moses Lake in Moses Lake, WA 98837. The parcel is lot 4 of the Weith Short Plat, located in the SE quarter of Section 36, Township 20 North, Range 27 East, WM, Grant County, WA. Parcel # 31-1552-000. SHORELINE ENVIRONMENT: Shoreline Residential. ZONING: Rural Residential 2. PUBLIC HEARING: None. CONSISTENCY STATEMENT: This proposal is subject to and shall be consistent with Grant County Code, International Building Code, and International Fire Code. Copies of application materials (File #P18-0108 and P18-0109) are available from Mary McRickard, Grant County Development Services, 264 West Division Avenue, PO Box 37, Ephrata, WA 98823, (509) 754-2011, ext. 2538, [email protected]. Office hours: 8 am-12 noon, 1-5 pm, M-F. Comments must be submitted to Development Services no later than 5:00 pm on May 21, 2018. Comments should be as specific as possible and may be mailed, e-mailed, or hand-delivered. All persons, agencies, or tribes have the right to comment, receive notice, participate in any hearings, request a copy of the final decision, and/or appeal the decision as provided by law and County Code. #04027/181694 Pub: April 19, 2018

March 21, 2011 1 p.m.

City of Moses Lake Notice of Application and Public Hearing

Boys and Girls Club of the Columbia Basin submitted an

December 6, 2011 noon

City of Moses Lake

Debbie Dunlap submitted an application for a Substantial

March 3, 2015 noon

City of Moses Lake

Notice of Application and Public Hearing

March 27, 2015 1 p.m.

City of Moses Lake

Notice of Application and Public Hearing

December 19, 2014 noon

City of Moses Lake

Notice of Application and Public Hearing

August 7, 2014 1 p.m.

City of Moses Lake

Notice of Application and Public Hearing

August 4, 2014 1 p.m.

City of Moses Lake

Notice of Application and Public Hearing

March 13, 2020 midnight

Legals for March, 13 2020

Columbia Basin Hospital reintroduces $30 million bond proposal
October 1, 2025 1:25 a.m.

Columbia Basin Hospital reintroduces $30 million bond proposal

EPHRATA — Columbia Basin Hospital is once again submitting to the community a $30 million bond proposition aimed at expanding its facilities and services. The bond will go before voters in the November general election. The bond was rejected during the primary election, with around 46% of voters in favor. It aims to address pressing infrastructure needs and enhance health services within the community, according to Administrator Rosalinda Kibby. “We are a public hospital district which means that our only chance to fund a project this big. We can afford smaller projects like $10 million, $5 million or projects of that size. We just did the emergency department remodel for less than $5 million,” Kibby said. “But when it comes to adding a new building, that will need to be done with public help.”