Friday, January 16, 2026
32.0°F

Legals for January, 16 2026

| January 16, 2026 12:00 AM

Notice of Proposed Public Hearing on a Planned Unit Residential Development: Jan 30th, 2026. Notice is hereby given that a Planned Unit Residential Development application was received by the City of Royal City on December 10th, 2025 from EM Land Consulting LLC and was found to be Technically Complete on Dec 15th, 2025. The application is for a proposed Multi-family residential development with 44 dwelling units between 7 buildings, on Tract B of the Pratt Hills Development Phase 1 Major Plat, (Parcel # 071734006). The property has been through SEPA review in the Pratt Hills Development Phase 1 Major Plat, which was issued an Optional Determination of Non-Significance (Dept of Ecology SEPA Register #202303981). The proposed development will require a City building permit for the project. The project application is available at City Hall for public review. PUBLIC HEARING for Planned Unit Residential Development: Friday, Jan 30th, 2026, at 3:00 p.m. in person at City Hall, 445 Camelia St. NE, Royal City, WA 99357. Friday, Jan 30th, 2026, at 6:00 p.m.— COMMENT PERIOD CLOSES Comments must be submitted by the date noted above to Alex Kovach, City Planner, via email at [email protected]. Comments submitted will be reviewed and considered during the decision-making process. All persons, agencies, or tribes have the right to comment, receive notice, participate in any hearings, request a copy of the final decision, and/or appeal the decision as provided by law and City Code. This may be the only opportunity to comment on the above listed materials. A decision on the application will be made within one hundred twenty (120) days of the date of the notice of completeness. #01006/44398 Pub: January 16, 2026

Superior Court of Washington, County of Grant In re: | Petitioner: | No. 25-3-00391-13 Sonia Sanchez Sanchez | | Summons Served by Publication And Respondent: | (SMPB) Luis Reynaldo Rodriguez Lopez | | SUMMONS SERVED BY PUBLICATION To: Luis Rodriguez Lopez I have started a court case by filing a petition. The name of the Petition is: Sanchez Sanchez v. Rodriguez Lopez You must respond in writing if you want the court to consider your side. Deadline! Your Response must be filed and served within 60 days of the date this Summons is published: December 26, 2025. If you do not file and serve your Response or a Notice of Appearance by the deadline: • No one has to notify you about other hearings in this case, and • The court may approve the requests in the Petition without hearing your side (called a default judgment). Follow these steps: 1. Read the Petition and any other documents that were filed at court with this Summons. Those documents explain what the other party is asking for. 2. Fill out a Response on this form (check the Response that matches the Petition): FL Parentage 332, Response to Petition for Parenting Plan, Residential Schedule and/or Child Support You can get the Response form and other forms you may need at: • The Washington State Courts’ website: www.courts.wa.gov/forms • Washington LawHelp: www.washingtonlawhelp.org, or • The Superior Court Clerk’s office or county law library (for a fee). 3. Serve (give) a copy of your Response to the person who filed this Summons at the address below, and to any other parties. You may use certified mail with return receipt requested. For more information on how to serve, read Superior Court Civil Rule 5. 4. File your original Response with the court clerk at this address: Superior Court Clerk, Grant County Law & Justice Center, P.O. Box 37 Ephrata, WA. 98823 address city/state/zip 5. Lawyer not required: It is a good idea to talk to a lawyer, but you may file and serve your Response without one. Person filing this Summons or his/her lawyer fills out below/(is /s Signature Date Courtney L. Bastian 53573 Print name and WSBA No., if any I agree to accept legal papers for this case at Lawyer’s address: 1240 S. Pioneer Way MOSES LAKE WA 98837 lawyer’s address city state zip Email: [email protected] This Summons is issued according to Rule 4.1 of the Superior Court Civil Rules of the state of Washington. #02004/44432 Pub: December 26, 2025 & January 2, 9, 16, 23, 30, 2026

Superior Court of Washington, County of GRANT In re: | Petitioner: | No. 24-3-00350-13 JESUS GEOVANY ZAMORA DE | Summons Served by Publication LEON | (SMPB) | And Respondent: | | PRISCILLA WALDILLA GALVEZ | MADRID | Summons Served by Publication To: PRISCILLA GALVEZ MADRID I have started a court case by filing a petition. The name of the Petition is: Petition for Divorce You must respond in writing if you want the court to consider your side. Deadline! Your Response must be filed and served within 60 days of the date this Summons is published: 01/09/2026. If you do not file and serve your Response or a Notice of Appearance by the deadline: - No one has to notify you about other hearings in this case, and - The court may approve the requests in the Petition without hearing your side (called a default judgement) Follow these steps: 1. Read the Petition and any other documents that were filed at court with this Summons. Those documents explain what the other party is asking for. 2. Fill out a Response on this form (check the Response the matches the Petition): FL Divorce 211, Response to Petition about a Marriage You can get the Response form and other forms you may need at: - The Washington State Courts’ website: www.courts.wa.gov/forms - Washington LawHelp: www.washingtonlawhelp.org, or - The Superior Court Clerk’s office or county law library (for a fee) 3. Serve (give) a copy of your Response to the person who filed this Summons at the address below, and to any other parties. You may use certified mail with return receipt requested. For more information on how to serve, read Superior Court Civil Rule 5. 4. File your original Response with the court clerk at the address. Superior Court Clerk, GRANT County Law & Justice Center, P.O. Box 37 Ephrata, WA, 98823 address city/state/zip 5. Lawyer not required: It is a good idea to talk to a lawyer, but you may file and serve your Response without one. Person Filing this Summons or his/her lawyer fills out below: /s 1/5/26 signature date RONALDO P. DELGADO 18873 Print name and WSBA No., if any I agree to accept legal papers for this case at Lawyer’s address 1209 E. WHEELER RD. MOSES LAKE WA 98837 Lawyer’s Address city state zip This Summons is issued according to Rule 4.1 of the Superior Court Civil Rules of the state of Washington. #02006/44792 Pub: January 9, 16, 23, 30, 2026 & February 6, 13, 2026

LEGAL NOTICE NOTICE IS HEREBY GIVEN AS REQUIRED BY RCW 35.21.157, Pertaining to  Solid waste collection – Rate increase. New rates will take effect March 1,  2026. Please visit our website at www.quincywashington.us to view the rates. Carrie Lnenicka Finance Director #01034/44938 Pub: January 13, 16 & 19, 2026

NOTICE IS HEREBY GIVEN THAT AN OPEN RECORD PUBLIC MEETING WILL BE HELD February 3, 2026, at 12:00p.m. in the Grant County Commissioners Hearing Room, Courthouse, Ephrata, WA to consider the following Unified Development Code Amendment applications: • File #P 25-0196 Unified Development Code (UDC) Amendment from Grant County. The applicant proposes an amendment to Chapter 25.24 of the Grant County Unified Development Code to adopt rules establishing a Countywide process for certifying and regulating shrubsteppe mitigation banks. At their regularly scheduled public hearing on January 7, 2026, the Grant County Planning Commission conducted an open record public hearing to consider file P 26-0196. The Planning Commission recommended approval of the proposed UDC amendment. Any interested persons may appear regarding these matters. Grant County is providing access to this scheduled hearing via Zoom. To participate in the hearing please call in to the hearing at 1 (253) 205-0468 and enter the meeting ID (940 4827 7440), meeting password (26229323). You will be joined to the meeting in a ‘muted’ status until such time as the hearing allows for public testimony. If you have any questions  about this procedure, please call the Commissioner’s Office in advance of the hearing. Barbara J. Vasquez, CMC Administrative Assistant & Clerk of the Board Grant County Commissioners #01044/44978 Pub: January 16, 2026

ADVERTISEMENT FOR BID   Sealed bids will be received for the following project:   PROJECT NUMBER: EW-C7713 PROJECT TITLE: Sun Lakes-Dry Falls State Park – Visitor Center Renovation PROJECT DESCRIPTION: This Contract includes renovation of an existing visitor center building, associated site work/ improvements and restoration of an existing historic rock wall. PROJECT LOCATION: This project is located at 35661 North Highway 17, Coulee City, WA., 99115 in Grant County. ESTIMATED BID RANGE: $2,400,000.00 - $2,800,000.00 PROJECT REPRESENTATIVE: Chris Carlson: (509) 665-4341 email: [email protected] PROCUREMENT COORDINATOR Brett Taylor PREBID WALKTHROUGH: 1:00 PM on Tuesday, January 27th, 2026. 35661 N. Highway 17, Coulee City WA 99115 [47.60663960904178, -119.3646709450104]. Meet at the Visitor Center Main Gate entry (ground floor). SUBMITTAL DUE DATE/TIME: 1:00 PM on Tuesday, February 24th, 2026 ELECTRONIC BIDDING: Bidders are required to register as vendors on the MRSC Bonfire Procurement Portal https://mrscrosters.bonfirehub.com to be eligible to submit bids. All bid submissions must be completed electronically through the State Parks Public Opportunities section of the portal. Bidders must use the official Bid Proposal Form, provided as part of the electronic bid documents, ensuring that all required fields are properly filled out and submitted before the deadline. (See Bonfire support details further down.)   PLANS, SPECIFICATIONS, ADDENDA, AND PLAN HOLDERS LIST: Contractors can access plans and specifications through the State Parks Public Opportunities-MRSC Bonfire Procurement Portal at https://mrscrosters.bonfirehub.com/portal.   Important: Bidders are encouraged to “Register as a Prime/GC Interest” on the project details page of the MRSC Rosters Bonfire Procurement Portal to be placed on the Bidders List. This service is free for Prime Bidders, Subcontractors, and Vendors interested in bidding on this project.   Additionally, plans and specifications are available through Builders Exchange Washington, Inc. at http://www.bxwa.com. Posted Projects”; “Public Works”, “Washington State Parks and Recreation. Bidders have the option to access Bid Documents, including Specifications and Drawings, at www.parks.wa.gov/contracts by clicking on the Construction Projects link for reference purposes. However, the official channel for bid notifications and addenda is the State Parks Public Opportunities-MRSC Rosters Bonfire Portal, and bidders should rely on it for the most up-to-date information.   PLANS MAY ALSO BE VIEWED THROUGH: Associated Builders And Contractors, Spokane WA; Tri City Construction Council, Kennewick WA; Daily Journal of Commerce, Seattle WA; Weekly Construction Reporter, Bellingham WA; Daily Journal Of Commerce Plan Center, Portland OR; Lower Columbia Contractor Plan Center, Longview WA; Abadan Spokane Plan Center, Spokane WA; ARC Document Solutions, Seattle, WA; Associated General Contractors, Boise, ID; Dodge Construction, Bedford, MA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Clackamas, OR; Wenatchee Plan Center, Wenatchee, WA; Spokane Regional Plan Center, Spokane, WA; Associated General Contractors, Spokane, WA; Walla Walla Valley Plan Center, Walla Wall, WA; Yakima Plan Center, Yakima, WA.   SUBMITTAL OF SPECIALIZED QUALIFICATIONS (Section 09 67 00 – Fluid Applied Flooring)   Bidders must submit the required specialized qualifications with their bid to remain responsive. This includes:   Manufacturer’s written approval confirming the Applicator is pe-qualified to install the specified seamless flooring system as specified in Section 09 67 00, Part 2.1. This approval must be valid as of the date of the bid submittal.   Documentation of experience showing both the Manufacturer and Applicator each have at least three years of experience with the specified flooring system, and that the Applicator employs mechanics with equivalent experience.   Bidders may use their own format for letters and experience summaries, provided they clearly address the requirements of Section 09 67 00 Part 1.4   TECHNICAL QUESTIONS regarding this project shall be directed to: Amy Browne-Minden, Architect – Design West Architects at telephone: (509) 290-6842, email: [email protected]   BID RESULTS will be published on the State Parks Public Opportunities-MRSC Rosters Bonfire Portal https://mrscrosters.bonfirehub.com/portal following the bid deadline and in the Construction Projects section at www.parks.wa.gov/contracts after the bid submittal. This practice ensures that those involved and interested can readily view bid outcomes, enhancing transparency and efficiency in the bidding process.   THE STATE OF WASHINGTON PREVAILING WAGE RATES are applicable for this public works project. Bidders are responsible to verify and use the most recent prevailing wage rates. The “Effective Date” for this project is the bid submittal time and date above.   BIDDER RESPONSIBILITY will be evaluated for this project. In determining bidder responsibility, the Agency shall consider an overall accounting of the criteria set forth in Division 00 – Supplemental Responsibility Criteria. Please direct questions regarding this subject to the Project Representative.   MANDATORY 15% APPRENTICE LABOR HOURS of the total labor hours are a requirement of this construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs.    SUBCONTRACTOR LISTINGS: Per RCW 39.30.060, when the bid proposal combined with any alternates totals one million dollars or more, the Bidder must list the Subcontractors they intend to use for structural steel, rebar installation, heating, ventilation, and air conditioning (HVAC), plumbing, and electrical work on the Subcontractor Utilization List form for this project.   ACCESS EQUITY: The successful Bidder is required to complete their vendor registration in Access Equity, a secure B2GNow online vendor management system. Prime Contractors already registered with B2GNow for any public entity must ensure their information is up to date. The system can be accessed either directly at https://omwbe.diversitycompliance.com/ or via the Office of Minority and Women’s Business Enterprises (OMWBE) website at https://omwbe.wa.gov/.   FOR THIS PROJECT, VOLUNTARY DIVERSITY GOALS HAVE BEEN SET: 10% for Minority Business Enterprises (MBE), 6% for Women’s Business Enterprises (WBE), 5% for Washington Small Businesses, and 5% for Veteran-owned businesses. While meeting these goals is not mandatory, it is strongly encouraged to promote diversity in business participation.   Bidders may contact the Office of Minority and Women’s Business Enterprise (OMWBE) at: http://omwbe.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in WEBS at https://pr-webs-vendor.des.wa.gov/ and Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-ownedbusinesses/vob-search.   Washington State Parks reserves the right to accept or reject any or all proposals and to waive informalities.   STATE OF WASHINGTON PARKS AND RECREATION COMMISSION CONTRACTS AND GRANTS   For assistance with the Bonfire Vendor Registration Process, please visit the following link: Vendor Registration Support   For guidance on the Bonfire Bid Submission Process, refer to this link: Bid Submission Support   Additional Bonfire Vendor Support resources, including support articles and instructional videos, are available at: Bonfire Vendor Support   If vendors experience any technical issues, they can contact Bonfire Support via email at [email protected]. #01045/44995 Pub: January 15 & 16, 2026

Moses Lake Irrigation and Rehabilitation District Small Works/Vendor Rosters Notice is hereby given that the Moses Lake Irrigation and Rehabilitation District (MLIRD) is accepting applications for its Small Works/Vendor Rosters for the year 2026. The Small Works Roster will be used to solicit and secure telephone and/or written quotations for maintenance and improvement projects. All vendors, contractors, suppliers, or other parties wanting to be included in the Small Works/Vendor Rosters must obtain an Application from the District. Applications may be obtained via telephone request at (509) 765-8716, email request at [email protected], or by written request sent to P.O. Box 98, Moses Lake, WA 98837. Dated this 12th day of January 2026 Moses Lake Irrigation and   Rehabilitation District BY: Sam Castro, C.P.O Executive General Manager #01048/45027 Pub: January 16, 2026

REQUEST FOR PROPOSAL MASONRY The Grand Coulee Senior Center is Requesting Proposals for a Contract to repair settlement and weather damage to the exterior walls of our building. The walls are constructed of concrete blocks. Work is focused on mortared joints between blocks. Proposals are due March 11 at 4 pm. If you are interested in submitting a Proposal please contact the Senior Center at 203 Main Street, Grand Coulee Wash 99133, via Email at [email protected] or by telephone at 1-509-633-2321.  #01049/45028 Pub: January 16, 23 & 30, 2026

NOTICE TO BIDDERS Sealed bids will be received by the Public Utility District No. 2 of Grant County at 154 A Street SE, Ephrata, Washington 98823 no later than 2:00 P.M. on February 4, 2026 for Supply Multi-Mode Fiber Optic Cable as more fully described in Contract Documents 170-13226.  The Bids will be opened and read aloud via Microsoft Teams on February 5, 2026 at 2:00 P.M. Please refer to Instructions to Bidders in the Contract Documents for meeting link. All bids shall be subject to and shall comply with the “Instructions to Bidders” contained in the Contract Documents, copies of which are available at our ProcureWare site https://gcpud.procureware.com. When reaching this site you will need to register as a new vendor if you are not already on our electronic vendor system.   Public Utility District No. 2 of Grant County, Washington By: Emilie DeLong Procurement Officer #01052/45067 Pub: January 16, 2026

LEGAL NOTICE PORT OF ROYAL SLOPE Royal City, WA SMALL WORKS / CONSULTANT ROSTER 2026 The Port of Royal Slope (Grant County Port Dist. #2) is compiling a 2026 Small Works/Consultant Roster pursuant to RCW 39.80. Licensed and insured contractors and consultants in all fields and engineering and architectural providers are invited to register with the port district. Forms can be downloaded from the Port’s website at http://www.portofroyal.com; Click the icon at the bottom of the Commissioner’s page or contact the Port at: Port of Royal Slope, P.O. Box 147; 4572 Road 13.6 SW, Royal City, WA 99357. Telephone (509) 346-2317, Email: [email protected] #01053/45074 Pub: January 16 & 23, 2026

PUBLIC NOTICE ADVERTISEMENT FOR BIDS Grant County Fire Protection District No. 3 Sealed bids for the building of two water tenders on chassis supplied by the District will be accepted on or before 4 p.m. on January 30th, 2026 at Grant County Fire District 3, 1201 Central Ave S, Quincy WA 98848. Vendors may obtain bid documents from Chief David Durfee at [email protected], Office (509)787-2713. Grant County Fire Protection District No. 3 reserves the right to reject any or all bids, waive minor irregularities in the bidding process, and to accept the bid deemed to be the best value for the District. #01054/45087 Pub: January 20 & 27, 2026