Friday, December 13, 2024
37.0°F

Legals for March, 25 2024

| March 25, 2024 12:00 AM

SUPERIOR COURT OF WASHINGTON IN AND FOR GRANT COUNTY In the Matter of the Estate of, | NO. 24-4-00052-13 | WILLIAM PAUL CROMER, | NOTICE TO CREDITORS | deceased. | | The Personal Representative named below has been appointed as Personal Representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the Personal Representative or the Personal Representative’s attorney at the address stated below a copy of the claim and filing the original of the claim with the court in which the probate proceedings were commenced. The claim must be presented within the later of: (1) thirty days after the Personal Representative served or mailed the notice to the creditor as provided under RCW 11.40.020(1)(c); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent’s probate and non-probate assets. Date of First Publication: March 18, 2024 Personal Representative: Brandon W. Cromer Attorney for Personal Representative: LARSON FOWLES, PLLC By: Dwayne C. Fowles, WSBA #27119 Address for Mailing or Service: Larson Fowles, PLLC 821 E. Broadway, Suite 8 Moses Lake, WA 98837 #03016/19967 Pub: March 18, 25, 2024 & April 1, 2024

SUPERIOR COURT, STATE OF WASHINGTON, COUNTY OF GRANT SPOKANE TEACHERS CREDIT UNION, ) a Washington state-chartered credit union, ) No. 23-2-00897-13 ) Plaintiff, ) SUMMONS BY PUBLICATION ) vs. ) ) CHRISTOPHER FAYLES, an individual,  ) ) Defendant. ) ) The State of Washington to CHRISTOPHER FAYLES: You are hereby summoned to appear within sixty (60) days after the date of first publication of this summons, to wit, within sixty days after the 11th day of March, 2024, and defend the above entitled action in the above entitled court, and answer the Verified Complaint for Money Judgment (“Complaint”) of Plaintiff Spokane Teachers Credit Union, and serve a copy of your answer upon the undersigned attorneys for Plaintiff Spokane Teachers Credit Union, at their office below stated; and in case of your failure so to do, judgment will be rendered against you according to the demand of the Verified Complaint, which has been filed with the clerk of said court. This case involves a charged-off credit account, and the resulting debt owed to Plaintiff Spokane Teachers Credit Union. DATED this 23rd day of February, 2024. PAINE HAMBLEN, P.S. By: /s/ Jeremy M. Zener Jeremy M. Zener, WSBA #41957 Attorneys for Plaintiff Spokane Teachers  Credit Union 717 W. Sprague Ave., Ste. 1200 Spokane, WA 99201 509-455-6000 #04003/20235 Pub: March 11, 18, 25, 2024 & April 1, 8, 15, 2024

SUPERIOR COURT OF WASHINGTON IN AND FOR CHELAN COUNTY In the Matter of the Estate of VIOLA C. BENNETT, Deceased. No. 24-4-00061-04 PROBATE NOTICE TO CREDITORS (RCW 11.40.030) The Personal Representative named below has been appointed as Personal Representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the personal representative or the Personal Representative’s attorney at the address stated below a copy of the claim and filing the original of the claim with the court in which the probate proceedings were commenced. The claim must be presented within the later of: (1) Thirty days after the personal representative served or mailed the notice to the creditor as provided under RCW 11.40.020(1)(c); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent’s probate and nonprobate assets. DATE OF FIRST PUBLICATION: March 11, 2024 PERSONAL REPRESENTATIVE: Thomas D. Overcast ATTORNEY FOR ADMINISTRATOR: Kera Dexter ADDRESS FOR MAILING OR SERVICE: Overcast Law Offices Attn: Kera Dexter 23 South Wenatchee Avenue, Suite 320 Wenatchee, WA 98801 COURT OF PROBATE PROCEEDINGS AND CAUSE NUMBER: Chelan County Superior Court, Cause No. 24-4-00061-04 Overcast Law Offices By: /s/ Kera Dexter, WSBA No. 58486 Attorney for Personal Representative #03040/20333 Pub: March 11, 18, 25, 2024

INVITATION FOR BID Sealed proposals will be received for the 2024 Pavement Maintenance project, addressed to the Port of Othello, 705 E Hemlock Street, Othello, WA 99344 until 1:00 pm local time on March 28, 2024, and then will be publicly opened and read. Bids received after the time fixed for the opening will not be considered. A non-mandatory pre-bid meeting will be held at the Port of Othello office at 10:00 am, local time March 21, 2024 for those interested contractors, subcontractors, and suppliers. Pre-bid meeting will not be held unless at least one contractor, subcontractor, or supplier confirms their attendance with the Port of Othello at least 24 hours prior to the scheduled meeting time. The project consists of but is not limited to, pavement rehabilitation of Runway 7/25, Parallel Taxiway B, Partial Parallel Taxiway A, hangar taxilane, and the tie-down and fueling, which includes concrete joint repair, crack sealing, pavement repair, pavement marking removal and application of a seal coat, along with reapplication of pavement markings.  Plans, Contract Documents and Specifications and any addenda are available at www.questcdn.com Project #9020853. You may download digital copies of the Bidding Documents (including any Addenda) from QuestCDN at www.questcdn.com upon payment of fifty dollars ($50.00). Log on to the website and enter Quest Project #9020853. Should you need assistance with this process, please contact QuestCDN at 952-233-1632. Partial sets of Bidding Documents will not be available from the Issuing Office. Bids will only be accepted from those registered QuestCDN plan holders. All questions regarding this project should be directed to the Engineer at lunterwegner@jub.com Each bid must be accompanied by a certified check, cash, cashier’s check, or bid bond in an amount not less than 5% of the total bid.  CIVIL RIGHTS – TITLE VI The Port of Othello, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, [select businesses, or disadvantaged business enterprises or airport concession disadvantaged business enterprises] will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award. The proposed contract is also under and subject to the following federal clauses: • Affirmative Action,  • Government-wide Debarment and Suspension • Government-wide Requirements for Drug-free Workplace • Foreign Trade Restrictions • Buy American Preference • Disadvantage Business Enterprise Requirements as follows: The Owner’s award of this contract is conditioned upon Bidder satisfying the good faith effort requirements of 49 CFR $26.53.  As a condition of bid responsiveness, the Bidder must submit the following information with their proposal on the forms provided herein:  1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract;  2) A description of the work that each DBE firm will perform;  3) The dollar amount of the participation of each DBE firm listed under (1);  4) Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Owner’s project goal 5) Written confirmation from each listed DBE firm that it is participating in the contract in the kind and amount of work provided in the prime contractor’s commitment; and 6) If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26. The documentation of good faith efforts must include copies of each DBE and non-DBE subcontractor quote submitted to the bidder when a non-DBE subcontractor was selected over a DBE for work on the contract. The successful Bidder must provide written confirmation of participation from each of the DBE firms the Bidder lists in their commitment. This Bidder must submit the DBE’s written confirmation of participation with the proposal documents as a condition of bid responsiveness.  All required Federal Clauses including the labor provisions, and wage rates are included in the specifications and bid documents. Each bidder must supply all of the information required by the bid documents and specifications. This project includes Federal funds and is subject to the wage provisions of the Washington State Public Works Laws, Federal Davis-Bacon, and related acts. Payments to the Contractor will not made unless Intent to Pay Prevailing Wages have been filed and approved for the Prime Contractor and all subcontractors. Each bidder shall furnish the Statement of Bidders Pre-Qualifications to the OWNER with satisfactory evidence of his competency to perform the work contemplated with the bid.  The Port of Othello reserves the right to reject any and all proposals, waive any informalities, or irregularities, postpone the award of the Contract for a period not to exceed One Hundred Twenty (120) days, and accept the proposal that is in the best interest of the Port of Othello. The award of the Bid is contingent upon the receipt of Federal funding. #03048/20460 Pub: March 13, 18, & 25, 2024

WW Pumping Service, Shawn Wood, 1326 S Columbia St Ste A Wenatchee, WA 98801-6027, is seeking coverage under the Washington State Department of Ecology’s Construction Stormwater NPDES and State Waste Discharge General Permit. The proposed project, W-W Pumping Services Storage Pond, is located at 20472 NW Baird Springs Rd in Quincy in Grant county. This project involves 7 acres of soil disturbance for Utilities construction activities. Some discharges and runoff goes to ground water. The receiving waterbody is unnamed stream. Any persons desiring to present their views to the Washington State Department of Ecology regarding this Application, or interested in Ecology’s action on this Application, may notify Ecology in writing no later than 30 days of the last date of publication of this notice. Ecology reviews public comments and considers whether discharges from this project would cause a measurable change in receiving water quality, and, if so, whether the project is necessary and in the overriding public interest according to Tier Il anti-degradation requirements under WAC 173-201 A-320. Comments can be submitted to: ecyrewqianoi@ecy.wa.gov, or ATTN: Water Quality Program, Construction Stormwater Washington State Department of Ecology P.O. Box 47696 Olympia, WA 98504-7696 #03056/20524 Pub: March 14 & 21, 2024

East Columbia Basin Irrigation District, Julio Gonzalez, PO Box E Othello, WA 99344, is seeking coverage under the Washington State Department of Ecology’s Construction Stormwater NPDES and State Waste Discharge General Permit.  The proposed project, EL86.4 Delivery System, is located at Approximately three-quarters of a mile southeast from the intersection of W Hatton Road and Gearhardt Road in Adams County, and it will continue south to Franklin County. A total of seven (7) miles of pipeline will be constructed between Adams and Franklin County.  This project involves 92.4 acres of soil disturbance for Utilities construction activities.  All discharges and runoff goes to ground water.  Any persons desiring to present their views to the Washington State Department of Ecology regarding this Application, or interested in Ecology’s action on this Application, may notify Ecology in writing no later than 30 days of the last date of publication of this notice. Ecology reviews public comments and considers whether discharges from this project would cause a measurable change in receiving water quality, and, if so, whether the project is necessary and in the overriding public interest according to Tier II anti-degradation requirements under WAC 173-201A-320.  Comments can be submitted to: ecyrewqianoi@ecy.wa.gov, or ATTN: Water Quality Program, Construction Stormwater Washington State Department of Ecology P.O. Box 47696 Olympia, WA 98504-7696 #03070/20669 Pub: March 18 & 25, 2024

SUPERIOR COURT OF THE STATE OF WASHINGTON COUNTY OF GRANT Estate of  | | HENDRIK MULDER | No. 24-4-00042-13 |                Deceased. | | PROBATE NOTICE TO | CREDITORS RCW 11.40.030 | The Personal Representative named below has been appointed as Personal Representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the Personal Representative or the Personal Representative’s attorney at the address stated below a copy of the claim and filing the original of the claim with the court. The claim must be presented within the later of: (1) Thirty days after the Personal Representative served or mailed the notice to the creditor as provided under RCW 11.40.020 (1) (C) (3); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent’s probate and nonprobate assets. Date of First Publication: March 25, 2024 Personal Representative:  /s/ Martha M. Foryan Martha M. Foryan, Personal Representative   Attorney for Personal Representative By:/s/ Rian J. Allred                        Rian J. Allred, WSBA No. 37840 1334 S. Pioneer Way Moses Lake, WA 98837 509-765-1708 #04013/20884 Pub: March 25, 2024 & April 1, 8, 2024

SUPERIOR COURT OF THE STATE OF WASHINGTON COUNTY OF GRANT Estate of  | | SUSAN B. MULDER | No. 24-4-00053-13 |                 Deceased. | PROBATE NOTICE TO | CREDITORS RCW 11.40.030 | The Personal Representative named below has been appointed as Personal Representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the Personal Representative or the Personal Representative’s attorney at the address stated below a copy of the claim and filing the original of the claim with the court. The claim must be presented within the later of: (1) Thirty days after the Personal Representative served or mailed the notice to the creditor as provided under RCW 11.40.020 (1) (C) (3); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent’s probate and nonprobate assets. Date of First Publication: March 25, 2024 Personal Representative: /s/Martha M. Foryan                                      Martha M. Foryan, Personal Representative   Attorney for Personal Representative By:/s/Rian J. Allred                        Rian J. Allred, WSBA No. 37840 1334 S. Pioneer Way Moses Lake, WA 98837 509-765-1708 #04014/20885 Pub: March 25, 2024 & April 1, 8, 2024

NOTICE TO BIDDERS Sealed bids will be received by the Public Utility District No. 2 of Grant County at 14352 Highway 243 S Building 6 Beverly, Washington 99321 no later than 10:00 A.M. on April 4, 2024 for WAN RBFL Valves as more fully described in Contract Documents 370-12118.  On the above date, the Bids will be opened and read aloud via Microsoft Teams. All bids shall be subject to and shall comply with the “Instructions to Bidders” contained in the Contract Documents, copies of which are available at our ProcureWare site https://gcpud.procureware.com. When reaching this site you will need to register as a new vendor if you are not already on our electronic vendor system.   Public Utility District No. 2  of Grant County, Washington By: Rebecca Diaz Procurement Officer #03081/20887 Pub: March 25, 2024

SUPERIOR COURT OF THE STATE OF WASHINGTON FOR THE COUNTY OF GRANT IN RE THE MATTER OF THE ESTATE: | NO: 24-4-00073-13 | ARVA L. LEISHMAN, | PROBATE NOTICE OF CREDITORS | Deceased. | RCW 11.40.030 | The personal representative named below has been appointed as personal representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the personal representative or the personal representative’s attorney at the address stated below a copy of the claim and filing the original of the claim with the court in which the probate proceedings were commenced. The claim must be presented within the later of: (1) Thirty days after the personal representative served or mailed the notice to the creditor as provided under RCW 11.40.020(l)(c); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent’s probate and nonprobate assets. Date of filing copy of notice to creditors: March 19 2024 Date of first publication: March 25 2024 Personal Representative: RICHARD A. LEISHMAN 2 Attorney for Personal Representative: Huberdeau Law Office, PS Address for Mailing or Service: 821 E. Sharon Ave., Moses Lake, WA 98837   /s/Richard A. Leishman RICHARD A. LEISHMAN, Personal Representative HUBERDEAU LAW OFFICE, PS By:/s/Jeremy S, Huberdeau Jeremy S. Huberdeau, WSBA #35428 Attorney for the Personal Representative 821 E. Sharon Ave. Moses Lake, WA 98837 Telephone: (509) 765-1196 Fax: (509) 765-1799 #04015/20908 Pub: March 25, 2024 & April 1, 8, 2024

NOTICE IS HEREBY GIVEN THAT AN OPEN RECORD PUBLIC HEARING WILL BE HELD April 9, 2024 at 3:15 p.m. in the Grant County Commissioners Hearing Room, Courthouse, Ephrata, WA to consider the following Public Works budget extension requests: *in the amount of $150,000.00 for the Baseline Road Widening Project using REET 2 funds. * in the amount of $11,443.00 to purchase a 2024 Tailking Trailer using ER&R Beginning Cash Balance (510). The trailer cost more than originally budgeted. Any interested persons may appear regarding these matters. Grant County is also providing access to this scheduled hearing via WebEx audio. To participate in the hearing please call in to the hearing at 1 (408) 418-9388 and enter the access code (2495 112 1152), you will be joined to the meeting in a ‘muted’ status until such time as the hearing allows for public testimony. If you have any questions about this procedure, please call the Commissioner’s Office in advance of the hearing. Barbara J. Vasquez, CMC Administrative Assistant & Clerk of the Board Grant County Commissioners #04016/20911 Pub: March 25, 2024 & April 1, 2024

Notice of Application - Date of Notice: March 25, 2024. Notice is hereby given that a Preliminary Short Subdivision application was received by Grant County on December 19, 2023, from Deanna Detwiler (Designated Contact: Western Pacific Engineering & Survey, Inc., Attn: Dan Leavitt), and was found to be technically complete on March 18, 2024. PROJECT:  a two (2) lot short plat located on APN 17-0919000 located outside the Urban Growth Area of Moses Lake. Lot 1 will be 15.203 acres +/- and Lot 2 will be 24.763 acres +/-. There is an existing well on Lot 2 that serves the existing residence. Lot 1 will have a separate well to serve the future residence. The resulting two lots will be accessed via Road H NE, which is located on the eastern border of the subject property. LOCATION: Site address is 10592 Rd H NE in the Rural Residential 1 (RR1) Zoning District, Section 08, Township 20 N, Range 28 E. Further described as SENE 8 20 28, situated in the County of Grant, State of Washington (GC Parcel 17-0919-000). ZONING: Rural Lands – Rural  Residential 1 (RR1). STUDIES REQUIRED: Habitat Assessment. PUBLIC  HEARING: None.  CONSISTENCY STATEMENT: This proposal is subject to and shall be consistent with Grant County Code, International Building Code, and International Fire Code. Copies of application materials (P 23-0322) are available from Willow Conley, Grant County Development Services, 264 West Division Avenue, PO Box 37, Ephrata, WA 98823, (509) 754-2011, ext. 2525. Office hours: 8 am– 5 pm, M-F. Comments must be submitted to the Planning Department no later than 5 pm on April 8, 2024. Comments should be as specific as possible and may be mailed or sent by facsimile. All persons, agencies, or tribes have the right to comment, receive notice, participate in any hearings, request a copy of the final decision, and/or appeal the decision as provided by law and County Code. This may be the only opportunity to comment on the above-listed materials.  #03083/20927 Pub: March 25, 2024