Saturday, September 07, 2024
97.0°F

Legals for June, 17 2024

| June 17, 2024 12:00 AM

NOTICE IS HEREBY GIVEN THAT AN OPEN RECORD PUBLIC HEARING WILL BE HELD June 25, 2024, at 3:20 p.m. in the Grant County Commissioners Hearing Room, Courthouse, Ephrata, WA to declare surplus county-owned property and order the sale thereof via public auction at www.publicsurplus.com, and/or www.GovDeals.com to the highest bidder. Property includes miscellaneous vehicle and equipment items. If you would like to receive the list of surplus items, please contact the Commissioner’s Office. Any interested persons may appear regarding these matters. Grant County is also providing access to this scheduled hearing via WebEx audio. To participate in the hearing please call in to the hearing at 1 (408) 418-9388 and enter the access code (2491 832 1928) password (26220586), you will be joined to the meeting in a ‘muted’ status until such time as the hearing allows for public testimony. If you have any questions about this procedure, please call the Commissioner’s Office in advance of the hearing. Brittany E. Lutz Deputy Clerk of the Board Grant County Commissioners.  #06032/23925 Pub: June 10 & 17, 2024

WASHINGTON DEPARTMENT OF ECOLOGY  NOTICE OF 30-DAY PUBLIC COMMENT PERIOD FOR AN AIR POLLUTION SOURCE  CyrusOne  1025 D Street NW  Quincy, WA 98848  Para asistencia en español: preguntas@ecy.wa.gov  CyrusOne submitted a notice of construction (NOC) application for their data center located at 1025 D Street NW, in Quincy. They’ve requested to replace two previously-permitted (but not bought or installed) 750kW emergency generators for the administrative building. These two emergency generators were not bought because of facility construction delays. When the building was ready for the emergency generators, the specific approved model was no longer available.  CyrusOne is requesting to update their air permit (“approval order”) with two newer emergency generator models of the same, manufacturer, size, and output, while maintaining their permit limits and conditions.  The emissions are not the same between the previously-permitted 750kW emergency generators and the newer ones. In some areas, emissions are slightly higher and in other areas, emissions are slightly lower. Overall, emission change is small.  Ecology determined this proposal satisfies the requirements of Chapters 173-400 and 173-460 WAC and the public is invited to comment. A public hearing will be held if Ecology determines there is significant public interest.  Review documents, submit written comments or questions  Written comments and questions are accepted from June 17, 2024, through July 25, 2024, by any of the following methods:  • Comment, request a public hearing, or review project documents at ecology.wa.gov/cyrusone • Andy Kruse, Washington Department of Ecology-Eastern Region, 4601 N. Monroe St., Spokane, WA 99205; andy.kruse@ecy.wa.gov, 509-405-0299.  Tentative online public hearing  An online public hearing will be held if Ecology determines there is significant public interest. If no significant written requests for an online public hearing are received by July 8, 2024, then the online public hearing will be cancelled.  • A tentative online public hearing is scheduled for Tuesday, July 16, 2024, at 6 p.m. Go to ecology.wa.gov/cyrusone to get up-to-date information, and login link if one is held.  This notice was posted on Ecology’s website on June 17, 2024.  To request ADA accommodations, contact Ecology’s ADA Coordinator by email at ecyadacoordinator@ecy.wa.gov, or call 360-407-6831, 711 (relay service), or 877-833-6341 (TTY).  #06045/24144 Pub: June 17, 2024

NOTICE TO CONTRACTORS Sealed bids, plainly marked “BID FOR H-SE RECONSTRUCTION PROJECT, CRP 19-10”, will be received by Grant County Department of Public Works located 124 Enterprise St. S.E., Ephrata, WA, 98823, until 1:00 P.M. Pacific Time, Tuesday, July 2, 2024 and will then and there be opened and publicly read.  All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier’s check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. No conditional bid bond will be accepted. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to Grant County. Maps, plans and specifications may be purchased from the Office of the County Engineer, 124 Enterprise St. S.E., Ephrata, WA 98823, upon payment of the amount of $25.00 (non-refundable). Informational copies of the maps, plans and specifications are on file for inspection at the Grant County Public Works Building, 124 Enterprise St. S.E., Ephrata, WA 98823, and in various plan centers located in Washington, at the following web site: http://www.grantcountywa.gov/GCPW/Current-Construction/Current-Construction-2020.htm The following is applicable to federal-aid projects: . “The Grant County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.” The Board of County Commissioners of Grant County, Washington, reserves the right to reject any and all bids. The award of this contract, if made, will be to the lowest responsible bidder. The improvement for which bids will be received follows: H-SE RECONSTRUCTION PROJECT – CRP 19-10 This contract provides for the reconstruction of 4.64 miles of Road H-SE from 12-SE to SR 262, a two lane county road in Grant County, WA, and the replacement of an existing bridge. This project is split into 2 phases, the roadway section and the bridge section. Other work to include bridge replacement, planing bituminous pavement, roadway excavation, embankment compaction, crushed surfacing, roadway striping, seeding and fertilizing, painted edge and centerline and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.   #07003/24164 Pub: June 17, 21, 24, 28, 2024 & July 1, 2024

NOTICE IS HEREBY GIVEN THAT AN OPEN RECORD PUBLIC HEARING WILL BE HELD June 25, 2024 at 3:30 p.m. in the Grant County Commissioners Hearing Room, Courthouse, Ephrata, WA to consider a resolution in the matter of adopting the Six Year Transportation Improvement Program for the years 2025-2030. The plan can be found at https://www.grantcountywa.gov/239/Public-Works. Any interested persons may appear regarding these matters. Grant County is also providing access to this scheduled hearing via WebEx audio. To participate in the hearing please call in to the hearing at 1 (408) 418-9388 and enter the access code (2491 832 1928), you will be joined to the meeting in a ‘muted’ status until such time as the hearing allows for public testimony. If you have any questions about this procedure, please call the Commissioner’s Office in advance of the hearing. Barbara J. Vasquez, CMC Administrative Assistant & Clerk of the Board Grant County Commissioners #06049/24233 Pub: June 17 & 24, 2024