Wednesday, December 11, 2024
32.0°F

Legals for June, 30 2023

| June 30, 2023 12:00 AM

NOTICE TO SUPPLIERS Sealed bids plainly marked “Bid for Steel Canopy Body” will be received by Grant County at the Grant County Public Works Office located in Ephrata, WA. 124 Enterprise Street, Ephrata, WA 98823, until 9:00 A.M., Tuesday, June 27th, 2023 and will then and there in the Public Meeting Room be opened and publicly read. This contract provides for furnishing and delivering a Steel Canopy Body in accordance with the plans and specifications. Plans, specifications and bid documents may be obtained from the Public Works Department at no charge. Informational copies of the maps, plans, and specifications are on file for inspection at the Public Works Department of Grant County, 124 Enterprise St. SE, Ephrata, WA 98823. The Board of County Commissioners of Grant County, Washington, reserves the right to reject any and all bids. The award of this proposal, if made, may be made in whole or in part as determined to be in the best interest of Grant County. The improvement for which bids will be received are as follows: Bid Specifications for Steel Canopy Body General Specifications This spec is patterned after the Knapheide KC7132H2094 Steel Canopy Body. - 133.25” L x 94”W x 90” H (40” H side compartments) - 20” side compartment depth - Curbside Horizontal (RH) compartment extends to rear of body - 14 and 16 gauge galvanneal steel body shell – Keyed alike stainless steel paddle handles with rotary style latches - Master locking system installed on both sides of body - Transverse-style L V 1 compartment extends to the back of R V 1 - (2) adjustable divider shelves in R V 1 compartment - (2) adjustable divider shelves in each L V 2 and R V 2 compartment - (1) bolt t- in divider shelf in R H compartment - (1) adjustable divider shelf in each L R and RR compartment - Double-panel galvanneal doors on rear of canopy (20 gauge outer, 14 gauge inner): - 49.5”W x 63.1” H clear door opening dimensions - Solid panel; no glass/ glass guards - 71.1” interior clear height - (2) L E D interior dome lights - (2) full length shelves on each side of canopy Interior - 6-year limited warranty - Electro- immersion epoxy primer process - Fully undercoated (Acrylic) - LED stop, tail, turn, and back-up lights - Chassis-specific install kit (loose): - Includes chassis- specific wiring harness adapter - 94”W Galva-grip bumper (loose) with hitch recess and K nap Liner coating - Canopy upper side doors with 3-point twist latches - Rear chute doors deleted - 94” wide knaplined Galva-grip step bumper Install Knapheide dual rear wheel KUV cc canopy body as follows: - S/T /T lights - Mud flaps - (1) fuel spout - (2) interior dome lights - Standard bumper Paint 132” K U V cc canopy body urethane: Ford paint code PQ 1 Exhaust extension to bring exhaust out flush with the body 1 Class V receiver hitch installed as follows: - 24,000 lb. maximum trailer weight , 1,600 lb. maximum vertical load - 2” receiver tube with pin and clip - Includes pin with cotter - Powder coated black 1 7-way trailer socket , RV style with flat blades 1LED compartment light strips in all compartments for an 8 compartment service body - High intensity LED light strips mounted on each side of the compartment - Wired to existing chassis upfitter switch 1 C T E H .D . Aluminum 7-drawer unit installed as follows: LV2 - 14” w x 32”h x 16”d - (4) -3”, (2) -5”, and (1) -7” removable drawers – Aluminum construction - Patented motion latch drawer handles - 250 lb. capacity roller slides - Powder coated red with black handles - (6) divider kits - Rubber liners in all drawers 1 Install customer’s existing Miller Bobcat 250 welder in LV1/ transverse compartment - Plumb exhaust up through canopy top 1 110v GFI electric outlet on rear of body wired to customer supplied welder (No inverter) Install (4) Whelen WHL31HAF LED beacon lights as follows: - Weld mounting plates to canopy - (2) at the front corners of canopy body - (2) at rear corners of the canopy - Install LED beacon light on mounting plates and wire to chassis upfitter switch 1 Install Ford Factory Backup Camera 1 Dominator Liner red, front of body 1 Speed Liner 1000 black, cargo area floor and tailgate Speed Liner 1000 black, cargo area sides Provide the cost to furnish and deliver (inclusive of shipping) F.O.B., the following items meeting the specifications: #06029/10148 Pub: June 14, 19, 26, 2023

SUPERIOR COURT OF WASHINGTON FOR GRANT COUNTY IN THE MATTER OF THE ESTATE ) NO. 23-4-00099-13 OF: ) Charles Edmund Quarles Jr., ) PROBATE NOTICE TO CREDITORS ) ) ) Deceased ) ) Gary E. Quarles has been appointed as Personal Representative (“Personal Representative”) of this Estate. Any person having a claim against the Decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided RCW 11.40.070 by serving on or mailing to the Personal Representative or the Personal Representative’s Attorney at the address stated below a copy of the claim and filing the original of the claim with the court in which the probate proceedings were commenced. The claim must be presented within the later of: (1) 30 days after the Personal Representative served or mailed the notice to the creditor as provided under RCW 11.40.020(1)(c); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and RCW 11.40.060. This bar is effective as to claims against both the Decedent’s probate and nonprobate assets.   DATE OF FIRST PUBLICATION: June 30, 2023 PERSONAL REPRESENTATIVE: ____________________ Gary E. Quarles ATTORNEY FOR PERSONAL  REPRESENTATIVE: Damiano Cacchiotti  ADDRESS FOR MAILING OR SERVICE: PO Box 680 Moses Lake, WA 98837 #06033/10211 Pub June 30, 2023 & July 7, 14, 2023

NOTICE TO MATERIAL SUPPLIERS Sealed bids plainly marked “Bid for Alternate Daily Cover 2023”, will be received by Grant County at Grant County Public Works, Meeting Room, 124 Enterprise St. S.E. Ephrata, WA 98823, until 3:30 PM, Tuesday, July 11, 2023, and will then and there be opened and publicly read for furnishing and delivering.  Quantity Description 176,000 lbs. Alternate Daily Cover Materials Informational copies of the proposal and specifications are on file with the County Engineer in the Grant County Public Works Building, 124 Enterprise St. S.E., Ephrata, WA 98823. The Board of County Commissioners reserves the right to reject or accept any or all portions of the bids received. #07004/10423 Pub: June 19, 22, 26, 29, 2023 & July 3, 6, 11, 2023

1982 Fleetwood, weston vin#orfliac20481452 on July 10th at 11 am at 2022 W Broadway #18 Moses Lake, WA 98837 #06048/10892 Pub: June 29, 30, 2023

STATE ENVIRONMENTAL POLICY ACT Determination of NonSignificance Date of issuance: June 30, 2023 Lead agency: Port of Moses Lake Agency Contact: Milton Miller mmiller@portofmoseslake.com (509) 762-5363 Description of proposal: STOKE Space Technologies (STOKE) proposes developing an additional Moses Lake Test Site (Project) on land leased from the Port of Moses Lake. This test stand would be adjacent to an existing stand which was previously approved through SEPA 202202325. The Project includes an industrial platform that will serve as a test stand for rocket engine testing. The platform will have lights and other basic electrical features, fiber, water, and piping for various fluid commodities (oxygen, natural gas, nitrogen). Improvements associated with the Project include paved access drives, water and sewer infrastructure, and storm water management improvements. A water storage tank will be constructed to supply water for a quench system associated with the test stand and rocket engine testing. Additionally, a concrete pad will be poured to accommodate bulk storage tanks for oxygen, natural gas, and nitrogen. Location of proposal: The proposed building site will be located in Grant County, Washington, at 8005 Road G NE, Moses Lake, WA, in portions of Sections 20 and 29, Township 20 North, Range 28 East W.M.  Project Proponent: Port of Moses Lake; Milton Miller, SEPA Responsible Official; 7810 Andrews N.E. Suite 200; Moses Lake, WA 98837 (509)762-5363 The Port of Moses Lake, as Lead Agency, has determined that this proposal will not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). We have reviewed the SEPA Environmental Checklist, drawings, and project studies on file with the lead agency. This information is available to the public on request. This determination is based on the following findings and conclusions: • The proposed site footprint is already heavily disturbed with previously con structed roads and staging areas. • A Wildlife and Habitat Site Assessment was performed by Jacobs and conclud ed that the project will not impact any high-quality habitat or wildlife species.   • A Cultural Resources Survey was conducted, and no cultural or historic sites were determined to be located within the project area.   • The combustion products of the engine testing that will occur on site are car bon dioxide and pure water vapor. There are no risks of environmental health hazards, exposure to toxic chemicals, or hazardous waste due to this project. • Best Management Practices will be used to prevent erosion and provide site stabilization during construction, and stormwater management will comply with the Eastern Washington Stormwater Manual by storing and infiltrating storm water on site. • Dedicated fire suppression is built into the test facility along with a 22,000-gal lon water storage tank on-site with two fire department connections. Risk of ire due to engine testing is low.   This DNS is issued under WAC 197-11-340(2). The lead agency will not act on this proposal for 14 days from June 30, 2023. Written comments must be submitted no later than 5:00 PM on July 14, 2023, to the Port of Moses Lake c/o Director of Port Facilities, 7810 Andrews Street NE Suite 200, Moses Lake, WA 98837 or via email to mmiller@portofmoseslake.com.  #06049/10894 Pub: June 30, 2023

NOTICE TO BIDDERS Sealed bids will be received by the Public Utility District No. 2 of Grant County at 154 A Street SE Ephrata, Washington 98823 no later than 2:00 P.M. on July 18, 2023 for Purchase of 3 Inch PVC Conduit for West Canal and Quincy Foothills Substation as more fully described in Contract Documents 170-11948.  The Bids will be opened and read aloud via Microsoft Teams on July 19, 2023 at 2:00 P.M. Please refer to Instructions to Bidders in the Contract Documents for meeting link. All bids shall be subject to and shall comply with the “Instructions to Bidders” contained in the Contract Documents, copies of which are available at our ProcureWare site https://gcpud.procureware.com. When reaching this site you will need to register as a new vendor if you are not already on our electronic vendor system.   Public Utility District No. 2  of Grant County, Washington By: Emilie DeLong Procurement Officer #06050/10899 Pub: June 30, 2023