Legals for September, 23 2022
Notice of Application, Proposed MDNS, Date of Notice: September 23, 2022- Notice is hereby given that a Discretionary Use Application and SEPA checklist were received by Grant County Development Services on July 25, 2022 from Weis Towers, (Designated Contact: John Wark, 835 Cliff Dr. Spokane, WA 99204 ) and were found to be Technically Complete on September 20 2022. Grant County expects to issue a Mitigated Determination of Non-Significance for this proposal, and the Optional DNS Process in WAC 197-11-355 is being used. This proposal may include mitigation measures under applicable codes, and the project review process may incorporate or require mitigation measures regardless of whether an EIS is prepared. This may be the only opportunity to comment on the environmental impacts of the proposal and the proposed mitigation measures. A copy of the subsequent threshold determination may be obtained upon request. PROPOSED MITIGATION MEASURES: 1. The landowner/applicant is responsible to determine if any other permits and/or licenses will be required by other local, state, and federal agencies. The owner/applicant shall acquire all such permits and/or licenses as required. 2. If any Native American gravesite or archaeological/cultural resources (artifacts) are found, all construction activity shall stop and the owner/developer shall immediately notify the Grant County Planning Division, the Colville Confederated Tribes, the Yakima Tribe, and the WA State DAHP. 3. The proposed development shall not inflict upon adjacent land(s) smoke, dust, glare, dirt, steam, vibration, noise, electrical interference, excessive hazards, odors, or pollution, which exceeds applicable local, state, or federal standards. PROJECT: A Discretionary Use Application and SEPA Checklist to allow the development of a Wireless Communication Facility (WCF) on an approximately 5-acre parcel. The WCF will include a 199-ft. tall (overall height) lattice-type tower, associated antennas, and ground-level support equipment within a 50- ft. x 50-ft. fenced compound. STUDIES REQUIRED NONE. LOCATION: The site address of the subject parcel is in the 41437 Road R NE, Hartline, WA 99135, just east of the Town of Hartline corporate limits. The site is located in the East 1/2 of Section 6, Township 25 N, Range 30E, W.M., Grant County, ZONING: Agriculture. PUBLIC HEARING: NONE CONSISTENCY STATEMENT: This proposal is subject to and shall be consistent with Grant County Code, International Building Code, and International Fire Code. Copies of application materials (Files #P22-0292 and #P22-0293) are available from Kent Ziemer, Grant County Development Services, 264 West Division Avenue, PO Box 37, Ephrata, WA 98823, (509)754- 2011, ext. 2538, kziemer@grantcountywa.gov. Front Office hours: 8 am -5 pm, M-F. Comments must be submitted to Development Services no later than 5pm on October 10, 2022. Comments should be as specific as possible and may be mailed, e-mailed, or hand-delivered. All persons, agencies, or tribes have the right to comment, receive notice, participate in any hearings, request a copy of the final decision, and/or appeal the decision as provided by law and County Code. This may be the only opportunity to comment on the above listed materials. #09049/562284 Pub: September 23, 2022
NOTICE TO CONTRACTORS Sealed bids, plainly marked "BID FOR 3-NE ROAD PHASE 3, CRP 21-03", will be received by Grant County Department of Public Works located 124 Enterprise St. S.E., Ephrata, WA, 98823, until 1:00 P.M. Pacific Time, Tuesday, October 18, 2022 and will then and there be opened and publicly read. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. No conditional bid bond will be accepted. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to Grant County. Maps, plans and specifications may be purchased from the Office of the County Engineer, 124 Enterprise St. S.E., Ephrata, WA 98823, upon payment of the amount of $25.00 (non-refundable). Informational copies of the maps, plans and specifications are on file for inspection at the Grant County Public Works Building, 124 Enterprise St. S.E., Ephrata, WA 98823, and in various plan centers located in Washington, at the following web site: http://www.grantcountywa.gov/GCPW/Current-Construction/Current-Construction-2020.htm The following is applicable to federal-aid projects: "The Grant County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award." The Board of County Commissioners of Grant County, Washington, reserves the right to reject any and all bids. The award of this contract, if made, will be to the lowest responsible bidder. The improvement for which bids will be received follows: 3-NE ROAD PHASE 3 - CRP 21-03 This contract provides for the reconstruction of 1.99 miles of Road 3-NE, from MP 8.91 to MP 10.90, a two lane county road in Grant County, WA, and includes roadway excavation, embankment compaction, crushed surfacing base course, crushed surfacing top course, HMA, roadway striping, seeding and fertilizing, painted centerline and edge line and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. #10003/562283 Pub: September 23, 26, 29, 2022 & October 32, 6, 10, 13, 17, 2022
SPECIAL MEETING NOTICE Moses Lake - On Tuesday, October 11th, 2022, the Port of Moses Lake Commissioners will hold a Special Meeting. The meeting is scheduled from 9:00 a.m. until 4:00 p.m. The meeting location is the Sagecliffe Resort, located at 344 Silica Rd NW, Quincy, WA., 98848. The purpose of this meeting will be the Port's Annual Budget Retreat. No decisions will be made. #09047/561985 Pub:September 23, 30, 2022
SUPERIOR COURT OF WASHINGTON COUNTY OF KING In the Matter of the Estate | | No. 22-4-05860-6 KNT of | | Ray Agnes Anderson, | Notice to Creditors | RCW 11.40.030 Deceased. | ____________________________________|__________________________________ The personal representative named below has been appointed and has qualified as Personal Representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the personal representative or the personal representative's attorney at the address stated below a copy of the claim and filing the original of the claim with the court in which the probate proceedings were commenced. The claim must be presented within the later of: (1) Thirty days after the personal representative served or mailed the notice to the creditor as provided under RCW 11.40.020(1)(c); or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent's probate and non-probate assets. Date of first publication: September 9, 2022. /s/ Kevin Edward Anderson_____ Kevin Edward Anderson Personal Representative /s/ Trip Hart_____________________ TRIP HART WSBA # 8913 Attorney for Personal Representative Address for Mailing or Service: 1224 Griffin Avenue Enumclaw, WA 98022-3012 Court of Proceeding and cause number: 22-4-05860-6 KNT Superior Court of Washington County of KING #09022/559486 Pub: September 9, 16, 23, 2022