Sunday, December 15, 2024
41.0°F

Legals October 21, 2019

| October 21, 2019 1:30 AM

Grant County, Washington, by and through the Board of County Commis-sioners, is seeking to contract with a qualified and experienced individual and/or consulting firm for Fire Investi-gation Services pursuant to RCW 43.44.050, 36.43.030, and 19.27.110 as applicable. Grant County has issued a Request For Proposal (RFP) for formal submittal of responsive proposals. Proposals are due no later than 4:00 p.m. (PST) on Monday, November 4, 2019. For complete details and RFP submittal requirements and timelines please view the published RFP on the Grant County web page at http://www.grantcountywa.gov/Request/Proposal/. Questions regarding the RFP should be directed to the Adminis-trative Services Coordinator, Jill Hammond in the Board of County Commissioners Office at (509) 754-2011, extension 2937. #10029/335342 Pub: October 14, 21, 2019

NOTICE IS HEREBY GIVEN THAT AN OPEN RECORD PUB-LIC HEARING WILL BE HELD October 29, 2019 at 8:45 a.m. in the Grant County Commissioners Hearing Room, Courthouse, Ephrata, WA to consider the following budget extension requests: *Administrative Services Coordinator in the amount of $177,500.00 for the following Strategic Infrastructure Pro-gram projects using Economic En-hancement Strategic Infrastructure ending fund balance (113.155): #2019-07 City of George -Frontage Road ($40,000 grant/$40,000 loan) #2019-08 Port of Royal Slope -Water-line Extension ($97,500.00 grant) * Central Services in the amount of $35,000.00 to complete the sidewalk construction project (sidewalks that border parking lots F, E, and B) using REET funds. * New Hope in the amount of $22,860.00 to receive grant funds from the US Department of Housing and Urban Development, Washington State Department of Commerce, and HopeSource for the Youth Homeless-ness Demonstration Project (CFDA #14.276) to provide services to home-less youth victims. Any interested per-sons may appear regarding these mat-ters. Barbara J. Vasquez, CMC Administrative Assistant & Clerk of the Board Grant County Commissioners #10034/335692 Pub: October 15, 21, 2019

Notice of Application and Public Hearing: October 21, 2019 Notice is hereby given that a Conditional Use Permit and SEPA Checklist were received by Grant County on October 14, 2019 from Quincy Solar Energy LLC (Designated Contact: Laura Miner, One South Wacker Way, Suite 1800, Chicago, IL, 60606) and were found to be Technically Complete on October 16, 2019. PROJECT: A Conditional Use Permit and SEPA checklist to allow the construction of a 120 megawatt photovoltaic solar electric generating facility. The facility components will include solar arrays and DC to AC inverter blocks, an underground electrical collection system, an electrical substation, an energy storage system, an operation and maintenance facility/building, on-site service roads, gates, security fencing, and temporary laydown and constructions areas. STUDIES REQUIRED: Cultural Resource Survey. LOCATION: The site address of the subject parcel is 5010 Rd 10 NE, Moses Lake, WA, 98837. The site is located approximately one mile northwest of the main runway at the Grant County International Airport in Section 1, Township 20 N, Range 27 E, W.M., Grant County, WA. (GC Assessor's Parcel #16-1606-000). ZONING: Agriculture. ADDITIONAL PERMITS: None. PUBLIC HEARING: Grant County Hearings Examiner tentatively scheduled for Wednesday, December 11, 2019 at 12:00 pm in the Commissioners Hearing Room at the Grant County Courthouse in Ephrata, WA. CONSISTENCY STATEMENT: This proposal is subject to and shall be consistent with Grant County Code, International Building Code, and International Fire Code. Copies of application materials (Files P19-0182 and P19-0189) are available from Ron Sell, Associate Planner, Grant County Development Services, 264 West Division Avenue, PO Box 37, Ephrata, WA 98823, (509)754-2011, ext. 2525. Office hours: 8 am to 5 pm, M-F. Comments must be submitted to the Planning Department no later than 5 pm on November 5, 2019. Comments should be as specific as possible and may be mailed or hand-delivered. All persons, agencies, or tribes have the right to comment, receive notice, participate in any hearings, request a copy of the final decision, and/or appeal the decision as provided by law and County Code. This may be the only opportunity to comment on the above listed materials. #10042/336908 Pub: October 21, 2019

Legal Notice: NOTICE IS HEREBY GIVEN that the Draft 2020 Assessment Roll and Schedule of Rates for the Moses Lake Irrigation and Rehabilitation District (MLIRD) 2020 Assessments is now on file and open to inspection at the office at 932 E. Wheeler Road, Moses Lake, Washington. The total proposed rate is $1.00 per Thousand Dollars of Total Assessed Valuation for 2020 for properties in the District ($.25 under RCW Ch. 87.84 and $.75 under RCW Ch. 87.03). The MLIRD Board of Directors may decide to reduce that rate but will not increase it. The Draft Assessment Roll and Schedule of Rates is based on the best information currently available to MLIRD with information provided by Grant County. Accordingly, the actual assessments for particular properties may vary from the current draft as valuation figures are updated or corrected by the County. The MLIRD Board of Directors will meet on November 12, 2019 at 6:45 p.m. in the MLIRD boardroom at 932 E. Wheeler Road, Moses Lake, Washington, as a Board of Equalization and hear objections to the Draft Assessment Roll and Schedule of Rates. The Board of Directors may, if necessary, continue in session from day to day as long as may be necessary, not to exceed ten days, exclusive of Saturday and Sundays, to hear and determine such objections to the said Draft Assessment Roll and Schedule of Rates as may come before them. After the Board of Equalization hearing is closed, the Board may change the Draft Assessment Roll and Schedule of Rates as may be just. #11004/336911 Pub: October 21, 28, 2019 & November 5, 2019