Legals June 4, 2019
INVITATION TO BID Grant County Central Services invites all qualified & interested bidders to submit bids on a new fire sprinkler system for the Ardell Pavilion Project # (CSD1913) located on the Grant County Fairgrounds in Moses Lake WA. Details are available for download at http://www.grantcountywa.gov/Request/Bid/ or https://plancenter.net Bid deadline is 6/18/2019 @3:30 PST #06015/298857 Pub: June 4, 5, 6, 7, 10, 11, 12, 13, 14, 15, 17, 18, 19, 20, 2019
IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON COUNTY OF CHELAN IN PROBATE In the Matter of the Estate | | NO. 19-4-00163-04 of | | PROBATE NOTICE TO CREDITORS VERNEL A. HELFRICH, | (RCW 11.40.030) | Deceased. | ____________________________ | The Personal Representative named below has been appointed as Personal Representative of this estate. Any person having a claim against the decedent must, before the time the claim would be barred by any otherwise applicable statute of limitations, present the claim in the manner as provided in RCW 11.40.070 by serving on or mailing to the Personal Representative or the Personal Representative's attorney at the address stated below a copy of the claim and filing the original of the claim with the court. The claim must be presented within the later of: (1) thirty days after the Personal Representative served or mailed the notice to the creditor as provided under RCW 11.40.020; or (2) four months after the date of first publication of the notice. If the claim is not presented within this time frame, the claim is forever barred, except as otherwise provided in RCW 11.40.051 and 11.40.060. This bar is effective as to claims against both the decedent's probate and nonprobate assets. DATE OF FIRST PUBLICATION: May 28, 2019 Dated this 15 day of May, 2019. By /S/ Michael H. Melbye MICHAEL H. MELBYE, Personal Representative Address: 7303 Upper Peoh Pt Cle Elum, WA 98922 Attorneys for Personal Representative: JEFFERS, DANIELSON, SONN & AYLWARD, P.S. By /S/ Evan M. McCauley Evan M. McCauley, WSBA NO. 44285 2600 Chester Kimm Road Wenatchee, WA 98801 CHELAN COUNTY CLERK'S OFFICE Ms. Kim Morrison, Clerk Chelan County Superior Court 350 Orondo Avenue, Suite 501 Wenatchee, WA 98801-2885 #06004/296376 Pub: May 28, 2019 & June 4, 11, 2019
MOSES LAKE DREDGE PROJECT The Moses Lake Irrigation and Rehabilitation District (MLIRD) requests comprehensive bids to remove an estimated 50,000 cubic yards of sediment material from the west side of the Alder Street Fill (Stratford Road), in Moses Lake. This effort will hydraulically dredge and pump sediment material to a site located approximately 3,000 feet away where contractor's suitable handling process, designed/engineered and clearly identified in your proposal will ensure all return water back to Moses Lake remains under 5 NTU over background for Turbidity at all times. Each bidder must submit a detailed and specific sediment management plan to remain within 5 NTU spec. This project will tentatively begin on July 1, 2019 and conclude no later than October 31, 2019. Each bidder must provide a summary of all similar freshwater dredging jobs it has performed over the preceding ten years that includes contact information for the owner or public entity for whom the dredging was performed. The selected contractor must be legal to operate & perform professional work of this nature in Washington State and have demonstrated experience and qualifications with a solid, comprehensive plan to have suitable dredging equipment with any and all project equipment on-site by July 1, 2019 to be considered. Additionally, each bidder must agree to the following: MLIRD reserves the right to make the final bid determination based on all information available to MLIRD, including but not limited to the bid submittal and information learned regarding prior work. Contractor to supply dredge and all associated project equipment suitable for this project with appropriate sediment management solutions for managing dredged spoils material within permit specifications. Selected contractor will be responsible for notices, signs, and agency reporting to include any and all daily required notifications or reports. Any project chemicals for use in dredged spoils material handling process must be clearly identified in bid proposal and approved for aquatic use in Washington State. Chemicals must be used in accordance with manufacturer label instructions with current best practices adhered to at all times and allowable under project permit(s). Proof of $5,000,000 insurance showing MLIRD as additional insured required w/bid proposal. Contractor must use DREDGEPACK Hydrographic software throughout the project and provide all documentation to MLIRD upon request and deliver a completed data package at project close with Final Report. All project personnel must be qualified and all project equipment & materials to be supplied by the contractor All submitting contractors are strongly encouraged to do a site-visit prior to submittal to ensure final proposals will meet MLIRD requirements. Contractor must provide list of similar freshwater application jobs that included turbidity management over the past ten years w/references for each job. Contractor must provide a copy of proof of Washington State worker's compensation insurance. Contractor must agree to the terms and conditions established by MLIRD for this contract (copy available upon request). Contractor MUST operate at all times within permit requirements and in a safe & workmanlike manner. Bid prices must separately itemize state sales tax (WSST) Bids must include all work, materials, supplies, and costs whether variable or not. Any variable that could affect price, including but not limited to standby charges, must be identified and a unit price stated. The total price of the bid shall be considered the total price of the contract except for variables so identified and priced. Project Deliverables in addition to work: 10 paper copies of: Detailed, comprehensive written 'Final Report' showing amount and locations of sediment removed, and including FINAL DREDGEPACK Hydrographic data provided through print and electronic means with a bathymetry survey that includes project 'as-found' condition(s) from project start. This is not an offer to contract. This is a request for an offer from bidders. MLIRD reserves the right to reject any or all bid submittals for any reason or no reason, to waive any or all irregularities if such waiver is deemed to be in the best interests of MLIRD, and select the bid that in the MLIRD review team's judgment, best serves the needs of MLIRD. If no responsive bid is received on the first call, the MLIRD Board may re-advertise and make a second call for bids, or may negotiate with bidders and enter into a contract without any further call, or may perform the work or improvement by its own labor. Submitted bid proposals must be clearly marked, "BID - MOSES LAKE DREDGE PROJECT", and MUST BE RECEIVED by MLIRD no later than Thursday, 3June 13, 2019 at 3:00 PM PST at 932 E Wheeler Rd, Moses Lake, WA 98837. Contact MLIRD for Project Packet that includes project information at 509-765-8716, mlird@mlird.org In the event of an inconsistency between the Project Packet and this Advertisement, the terms of this Advertisement govern. This is a Public Works Project and Washington State Sales Tax (WSST) applies. - 5% Retainage withheld until project completion, - 5% Bid Bond/Bid Deposit Required w/Bid Submission - Performance and Payment Bond Required #06008/296852 Pub: May 29, 2019 & June 4, 11, 2019
NOTICE OF PRIVATE SALE The following property will be sold by written bid by 9:00 a.m. MST on June 19, 2019 2013 Wabash Reefer 1JJV532B5D777003 To inquire about this item please call David Law at 801-624-5810. Transportation Alliance Bank 4185 Harrison Blvd Ogden, UT 84403 #06014/298739 Pub: June 4, 5, 2019