LEGAL NOTICE
NOTICE OF PRE-QUALIFYING FOR TRANSMISSION & DISTRIBUTION LINE CONSTRUCTION AND MAINTENANCE, AND SUBSTATION CONSTRUCTION AND MAINTENANCE
NOTICE OF PRE-QUALIFYING FOR
TRANSMISSION & DISTRIBUTION LINE CONSTRUCTION AND MAINTENANCE, AND SUBSTATION CONSTRUCTION AND MAINTENANCE
Application for Pre-Qualification of Contractors for electrical construction or improvement of an electrical facility (as described below):
Pursuant to RCW 54.04.085, Contractors wishing to be considered by Public Utility District No. 2 of Grant County, Washington for designation as a pre-qualified bidder for transmission and distribution line construction and maintenance, and for substation construction and maintenance must submit a Pre-Qualification Application. The applications will be reviewed and only those which are approved will be eligible to receive electrical construction/improvement bid documents for the 2016 construction year. Completed applications must be received no later than October 30, 2015 for all projects scheduled in the 2016 construction year. The District is required to evaluate applications once every year. The following construction projects are anticipated to start construction in 2016 (this list is NOT all inclusive):
• 2017-2018 Dock Crew Contract, this will be bid during the later portion of 2016
• Rocky Ford to Dover, 115kV Transmission Line, approximately 8 miles
• Quincy Plains 230kV Tap approximately 1 mile.
Pre-qualification forms may be obtained by registering at the District's website at: www.ebidexchange.com/gcpud or by contacting the District's T&D Engineering Department
via e-mail to Sheila Wald at swald@gcpud.org. Hard copies of the required documents
including the completed and original application form must be received no later than October 30, 2015. Should you have questions, contact Sheila Wald at (509) 793-1479 or Patrick Bishop at (509) 793-1556.
PUBLIC UTILITY DISTRICT No. 2
OF GRANT COUNTY, WASHINGTON
Sheila Wald
Project Specialist
(509) 793-1479
#09056/4693108
Pub.: September 30, 2015