Friday, November 15, 2024
30.0°F

NOTICE TO CONTRACTORS

| June 8, 2015 1:00 PM

STRATFORD ROAD SIDEWALK PROJECT - 2015

STRATFORD ROAD SIDEWALK PROJECT - 2015

Moses Lake, Washington

Sealed bids will be received at Civic Center Annex, 321 South Balsam, (P. O. Box 1579), Moses Lake, Washington 98837 until July 1, 2015; 2:00 pm, for the above-named improvement. Said bids will be opened and publicly read at that time. All bids shall be received before said opening time in sealed envelopes with STRATFORD ROAD SIDEWALK PROJECT - 2015 marked plainly thereon.

All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or bond in an amount equal to 5 percent of the maximum total amount of the bid. Should the successful bidder fail to enter into a contract or furnish a satisfactory contract bond within the time stated in the specifications, the deposit shall be forfeited to the City.

Plans and specifications shall be obtained at the Civic Center Annex at the above address for a non-refundable fee of $40.00. Only bids from bidders who have purchased plans and specifications at the Civic Center Annex will be accepted. Copies of plans and specifications are on file for review at various construction councils.

Contact person: Michael G. Moro, P.E.; (509)764-3784

PROJECT DESCRIPTION: The Work includes construction of sidewalks, bus turn-out, and pedestrian at-grade railroad crossing on Stratford Road, between State Route 17 and Maple Drive. Stratford Road is an existing curbed street. Associated Work includes embankment and excavation, fences, catch basin and connections, striping and signing, curb ramps, utility adjustments, asphalt patching, sawcutting, traffic control, inlet protection, conduit installation for street lights, and associated work in accordance with the plans and specifications.

Estimated Project Cost: $290,000.00

The City Council reserves the right to reject any or all bids if such action is in the best interest of the City.

#06028/4478488

Pub.: June 5 & 8, 2015