NOTICE TO CONTRACTORS

| June 2, 2014 1:00 PM

RESERVOIR #7 RAISING PROJECT REBID - 2014

RESERVOIR #7 RAISING PROJECT REBID - 2014

Moses Lake, Washington

Sealed bids will be received at Civic Center Annex, 321 South Balsam, (P. O. Box 1579), Moses Lake, Washington 98837 until JUNE 17, 2014; 2:00 P.M., for the above-named improvement. Said bids will be opened and publicly read at that time. All bids shall be received before said opening time in sealed envelopes with RESERVOIR #7 RAISING PROJECT REBID - 2014 marked plainly thereon.

All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or bond in an amount equal to 5 percent of the maximum total amount of the bid. Should the successful bidder fail to enter into a contract or furnish a satisfactory contract bond within the time stated in the specifications, the deposit shall be forfeited to the City.

Plans and specifications shall be obtained at the Civic Center Annex at the above address for a non-refundable fee of $50.00. Only bids from bidders who have purchased plans and specifications at the Civic Center Annex will be accepted. Copies of plans and specifications are on file for review at various construction councils.

Contact person: Shawn O'Brien, P.E.; (509)764-3786

PROJECT DESCRIPTION: This project consists of designing and constructing the foundation and shell modifications required to raise the overflow elevation of an existing standpipe by 20.66 feet and maintain 1.30 million gallons of storage above an elevation of 1260.0. The existing standpipe was built in 1991 and is 118.0 feet to overflow and 62.0 feet in diameter.

Estimated Project Cost: $1,000,000.00

The City Council reserves the right to reject any or all bids if such action is in the best interest of the City.

#06009/3778523