DIVISION STREET LIFT STATION - 2012

DIVISION STREET LIFT STATION - 2012

Moses Lake, Washington

Sealed bids will be received at City Hall, 321 South Balsam, (P. O. Box 1579), Moses Lake, Washington 98837 until  February 01, 2012;  1:00 P.M.,  for the above-named improvement.  Said bids will be opened and publicly read at that time.    All bids shall be received before said opening time in sealed envelopes with DIVISION STREET LIFT STATION - 2012 marked plainly thereon.

All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or bond in an amount equal to 5 percent of the maximum total amount of the bid.  Should the successful bidder fail to enter into a contract or furnish a satisfactory contract bond within the time stated in the specifications, the deposit shall be forfeited to the City.

Plans and specifications shall be obtained at the City Hall at the above address for a non-refundable fee of $35.00.  Only bids from bidders who have purchased plans and specifications at the City Hall will be accepted.  Copies of plans and specifications are on file for review at various construction councils.

Contact person: Michael G. Moro, P.E.; 509-764-3784

PROJECT DESCRIPTION:    This project consists of replacing two 5-horsepower pumps with two 10-horsepower pumps including upgrades to the electrical service and system, and replacing existing pipes, valves, and appurtenances within the pump vault.  This project also includes removal of existing motor controls, telemetry equipment, generator transfer switch, generator and fuel tank; and includes installation of new motors and controls, telemetry equipment, variable frequency drives, self-contained generator and transfer switch; and includes removal and replacement of ladders and platforms, construction of a bypass port and bypass chute, fencing revisions, painting, construction of concrete access and driveway, water service reconstruction, curb replacement, asphalt patch, bypass pumping, and traffic control.

Estimated Project Cost: $275,000.00