Monday, May 06, 2024
62.0°F

PUBLIC NOTICE

| September 12, 2008 9:00 PM

Please be advised that the next regular meeting of the North Central Washington Regional Support Network Advisory Board will be held on the date, time and location listed below. The public is invited to attend. For any disability accommodation requests, please contact geigerd@ncwrsn.com no later than five (5) days before the event.

September 17, 2008

11 AM to 1 PM

North Central Washington Regional Support Network

119 Basin Street SW, Ephrata, WA 98823

#09010

Pub.: September 5, 12, 2008

CITY OF MOSES LAKE

PUBLIC HEARING NOTICE

NOTICE IS HEREBY GIVEN that a public hearing will be held before the MOSES LAKE CITY COUNCIL, at the Police/Council Facility located at 401 S. Balsa, at 7:00 p.m. on September 23, 2008, to consider the following:

The vacation of the alley adjacent to Lots 2 - 6 and 11 of Parkhill - Scea Addition.

Any person wishing to file for or against the above mentioned request may be heard at the above stated time and place.

DATED: September 2, 2008

s/Ronald R. Cone

Finance Director

#09029

Pub.: September 12, 2008

NOTICE TO CONTRACTORS

DIVISION STREET ACTIVITY TRAIL

Moses Lake, Washington

Sealed bids will be received at City Hall, 321 South Balsam, (P.O. Box 1579), Moses Lake, Washington 98837 until October 8, 2008, 2:00 p.m., for the above-named improvement. Said bids will be opened and publicly read at that time. All bids shall be received before said opening time in sealed envelopes with "DIVISION STREET ACTIVITY TRAIL REBID" marked plainly thereon.

All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or surety bond in an amount equal to 5 percent of the bid. Should the successful bidder fail to enter into a contract and/or to furnish a satisfactory contract bond within the stated in the specifications, the deposits shall be forfeited to the City.

Copies of plans and specifications are on file at various construction councils and at City Hall and may be obtained for non-refundable fee of $40.00 at the above address. Only bids from those who have purchased plans and specifications will be accepted per the special provisions.

Contact person: Richard A. Law, P.E., 509-766-9217

PROJECT DESCRIPTION: This project consists of removing 290 square yards of concrete sidewalk, sawcutting 875 lineal feet of asphalt, removing 310 square yards of asphalt pavement, and 875 lineal feet of curb and gutter. The project also includes installing 875 lineal feet of curb, 1,190 square yards of concrete sidewalk, and 310 square yards of HMA patch. Five existing access ramps will be fitted with surface mounted detectable warning panels, and three access ramps will be constructed including cast in place detectable warning panels. Project includes repairing four locations around the city on a lump sum basis for each location. Spot repairs will include various combinations of: removing and replacing curb, sawcutting, removing and patching asphalt, replacing and adjusting catch basin frames and grate, installing access ramps including detectible warning panels.

Estimated Project Cost: $98,000

The City Council reserves the right to reject any or all bids if such action is in the best interest of the City.

Publish - Columbia Basin Daily Herald, September 12, 2008 and September 15, 2008.

#09038/

Pub.: September 12, 15, 2008