A refurbished rotor is placed inside the G22 generator at Grand Coulee Dam. This was the final of three generators to go back online after the dam’s overhaul project began at the site in 2013. The Bonneville Power Administration is continuing to work to enhance the power grid in the Pacific Northwest with various projects proposed in Washington and Oregon.
October 15, 2024